09 Jul 2014 |
Installation of MIKE by DHI on Moffatt & Nichol’s High Performance Computing system
Moffatt & Nichol – one of the world’s leading specialised maritime planning and engineering firms – installed our MIKE by DHI software on their High Performance Computing (HPC) system.
|
02 Jul 2014 |
Restoring India’s Yamuna River
We're helping the Government of India improve the water quality in the Yamuna River Basin. The Yamuna River is the largest tributary of the Ganga River and one of the most important and sacred rivers in India.
|
17 Jun 2014 |
Consultancy services for the sewerage network in Salalah, Oman
This is the outside air ventilation unit which extracts air from the inlet chamber of the pumping station
As a sub-consultant to Associated Consulting Engineers Int’l and Partners llc (ACE), we’re providing modelling services to the Salalah Sani
|
11 Jun 2014 |
Supporting the Port of Brisbane’s capacity expansion plans
In order to help with the Port of Brisbane’s capacity expansion plans, we developed an integrated numerical model for the Port of Brisbane Pty Ltd (PBPL) – the entity that manages and develops the port.
|
09 Jun 2014 |
We participate at the Singapore International Water Week 2014
We participated at the Singapore International Water Week (SIWW), which was held on 2 – 4 June 2014 at the Sands Expo and Convention Centre, Marina Bay Sands at Singapore.
|
27 May 2014 |
Assessing noise-related impacts of acoustic disturbances on marine mammals
We developed the Dynamic Risk Assessment Model for Acoustic Disturbance (DRAMAD), which models the movements of marine mammals before, during and after noise exposure. Current noise risk assessment models assume that marine mammals are stationary.
|
23 May 2014 |
DHI Slovakia wins nationwide flood mapping project
DHI Slovakia has been awarded a countrywide flood mapping project.
|
15 May 2014 |
Supporting a major water supply improvement and sanitation project in Bangladesh
We are providing hydraulic modelling services for a major water supply improvement and sanitation project in the Bangladeshi city of Chittagong.
With an estimated population of 4.
|
12 May 2014 |
Successful FEFLOW workshop in Denver
On 8 May 2014, DHI United States and DHI Germany jointly offered the workshop ‘State-of-the-Art Groundwater Modelling for Water Resources Management and Well-Field Operation’.
|
08 May 2014 |
Successful workshop conducted on the Elbow River Integrated Modelling Project
Dr. Danielle Marceau and her team of researchers at University of Calgary’s Schulich School of Engineering hosted a workshop on 25 April 2014.
|
06 May 2014 |
Helping Malawi overcome its water-related challenges
The World Bank has contracted us for two projects in order to help Malawi address its looming water-related challenges. The projects (cumulatively worth USD 5.
|
21 Apr 2014 |
Evaluating the future impact of land-use and development policies for the Elbow River Watershed
We helped Alberta Environment and Sustainable Resource Development (ESRD) and the University of Calgary develop an integrated dynamic modelling system for the Elbow River watershed.
|
18 Apr 2014 |
Helping to assess the supply and demand for the Okanagan Basin’s water
We developed a hydrologic model for the 21,600 km2 Okanagan Basin Water Board (OBWB) – in collaboration with Summit Environmental – to help authorities assess water needs and availability.
|
16 Apr 2014 |
Providing the modelling software for a project using drones to analyse coastal erosion
We are a partner on the Innovative Methodologies for Coastal Environmental Monitoring and Analysis (MIRAMar) project in Italy. Researches will use our MIKE by DHI software for the modelling portion of the study.
|
08 Apr 2014 |
3rd DHI Middle East conference conducted successfully in Dubai
We successfully conducted the 3rd DHI Middle East conference on 11 March 2014 in Dubai. Decision-makers as well as industry and water modelling experts attended the conference.
|
20 Mar 2014 |
Developing a marine forecast service for the Port of Gothenburg
In collaboration with DHI, the Port of Gothenburg in Sweden has developed the Gothenburg Marine Forecast Service. The operational model driving the forecasting service utilises our MIKE 3 FM software.
|
18 Mar 2014 |
This year’s first MIKE by DHI public training in China conducted successfully
On 17-21 March 2014, we conducted our first MIKE 21 and MIKE 21C public training session this year in Shanghai, China. Over 130 participants from scientific research institutions, design companies and universities attended the five-day course.
|
11 Mar 2014 |
Successful MIKE by DHI User Group Meeting in Sweden
The 4th joint MIKE by DHI User Group Meeting (UGM) in the Norway-Sweden region was conducted successfully in Stockholm on 4-5 March 2014.
|
10 Feb 2014 |
Helping to improve the water supply and distribution system in Rajasthan, India
In order to benchmark the water supply and distribution system in the western Indian state of Rajasthan, we conducted hydraulic modelling of the system in 222 towns.
|
30 Jan 2014 |
Enabling efficient flood risk mapping, forecasting and regulation of Denmark’s Gudenå River
In order to help identify and implement new management/maintenance measures for the Gudenå River in Denmark, we developed an integrated hydraulic model based on our MIKE by DHI software suite components.
|
29 Jan 2014 |
Helping Botswana protect the Okavango Delta wetland system
We developed a comprehensive integrated model complex based on our MIKE Powered by DHI software suite components to support the Okavango Delta Management Plan (ODMP), developed by the Botswana government.
|
14 Jan 2014 |
Improving water management in North India
We developed a Real-Time Decision Support System (RTDSS) for the Bhakra Beas Management Board (BBMB) in Northern India. Our RTDSS provides BBMB with the latest information available on the state of the water in its catchment and command area.
|